- Food Storage/Freezer: 20,000 square feet, 3-levels, concrete structure
- This project was managed out of our home office in Jackson, TN.
- All facets of the plumbing and HVAC piping and supports are included.
- Stainless drains for 2nd floor, and destratification ZOO fans.
- HVAC equipment included ducted split unit on ground floor and supply/exhaust fans for upper floor.
- Foord storage and packaging for existing poultry processing facility on same site.
- Completion in April 2024
Matlock Companies Pledges $250,000 to Advance Music Education and Healing Programs of The Jackson Symphony
JACKSON, TN, September 24, 2025