- 149,000 square foot facility with 50 foot tall roof
- Managed from the Jackson, TN Matlock Mechanical office
- Plumbing, HVAC & Process piping including over 15,000 ft of piping
- Project involves renovating an existing building into a modern manufacturing operation to support Alu Materials America’s growing US presence serving the electric vehicle, solar energy, construction and building industries.
- Project start and finish dates 3/2/26 to ongoing
- Matlock to install over 15,000 ft of piping in 6 weeks in order to get the owner operational with their process equipment. This was done at the same time that the owner’s equipment was being installed and concrete floors were being demolished and re-poured. The owner and general contractor said it was nothing short of a miracle.